Equipment & Logistics Fleet

Deck-Ready
Infrastructure

Proving to oil majors that we have the ruggedized marine infrastructure to mobilize anywhere. Every asset is enclosed in DNV 2.7-1 certified rigging pods, staged for rapid deepwater transport and deck deployment.

/F
Automated Hull Crawler V4
HC-V4
Robotic Surface Prep

Automated Hull Crawler V4

Magnetic-track crawler deploying UHP jetting heads across vertical hull plating — removing operators from confined splash-zone exposure.

40 m vertical
Reach
40,000 psi
Pressure
DNV 2.7-1
Certification
High-Capacity Dehumidifier DH-900
DH-900
Climate Control

High-Capacity Dehumidifier DH-900

Desiccant dehumidification maintaining sub-dew-point conditions inside enclosed platform habitats for flawless coating cure.

9,000 m³/h
Airflow
< 40%
RH Control
Bulk Blasting Hopper BH-25
BH-25
Abrasive Logistics

Bulk Blasting Hopper BH-25

25-tonne enclosed grit hopper mounted in certified offshore rigging pods for safe crane transfer and continuous feed.

25 t
Capacity
Crash-frame
Pods
Offshore Rigging Pods
RP-X
Certified Transport

Offshore Rigging Pods

DNV 2.7-1 crash-frame containers housing pumps, compressors, and blast pots — mobilized deck-ready to any basin.

DNV 2.7-1
Standard
< 24 hrs
Deploy
< 24h
Mobilization Window
3
Global Staging Hubs
100%
DNV 2.7-1 Pods
360t
Total Fleet Capacity

Ready to protect your offshore assets?

Request a Project Bid
ACCP. Marine

Advanced Coating & Corrosion Protection for deepwater rigs, FPSOs, and platforms in the world's harshest marine environments.

Navigate

Certifications

  • AMPP / NACE
  • DNV 2.7-1
  • ISO 9001
  • ISO 45001
  • Jones Act Compliant
  • IADC Member

EHS Procurement

bids@accp-marine.com

+3 246 879 787

+1 (626) 386-3529

Keathley Canyon, Block 962

© 2026 ACCP Marine Integrity. All rights reserved.Zero-Incident · Zero-Compromise